Project overview

Queen Elizabeth College

Project title

Campus WAN

Company name

Queen Elizabeth College

Industry sector

Education

Business description

Primary and secondary private school

No of company employees

100

Company locations

1 UK site

Location of company HQ

Crediton

Technical infrastructure

3Com 10Mbps WLAN

Project requirements

Design and install a high speed WAN to carry voice, video and data between the primary school and the secondary school over a distance of 1km

Project description
  • Line of sight survey and RF audit of each campus to identify optimum transmission path and locations for WLAN access points
  • Installation and configuration of MRV line of sight laser cameras
  • Reuse existing WLAN system as back up solution
  • Provision of electrical contracting and structured cabling to integrate cameras into existing LAN
  • Installation, configuration and commissioning of routers, laser cameras and WiFi access points
  • Line of sight system handover to QES local IT manager
  • Full systems documentation
Products supplied
MRV Terescope laser cameras, Krone CAT5e structured cabling